Front Porch Forming
10M rebar at 10" O.C. with 1.5" standoffs and ready for concrete pour
Forming of rear yard porch and steps
15M rebar installed in both directions at 8" O.C.
ICF foundation addition
8" ICF blocks with 15M reinforcement at 16" O.C. vertically and 10M 16" O.C. horizontally. Metal bracing installed at 5' intervals
ICF front porch foundation
8" ICF block with 15M reinforcement.
Insulated Basement Slab
R 10" thick 20 MPa under slab insulation shiplaped and seam taped prior to basement slab pour.
ICF walkout addition.
Side yard basement walkout addition constructed using 8" ICF block. ICF was reinforced @ 16" O.C. with 15M rebar both verically and horizontally
Concrete front Porch
Newly formed front porch poured with 32 MPa concrete with 6% air entrapment.
Footing forming for addition
23" wide footing with 2 10M rebar reinforcements and dowels @ 48" O.C.
Basement Drains
New 4" pvc drains including backflow preventer valve and sump pit.
CONCRETE FORMING- ICF FONDATIONS-WALKOUT ADDITIONS